
Sodding Services
Sod That’s Built to Last
Fresh or Artificial, We’ve Got
Your Yard Covered
Your Yard Covered
At Ignite, we believe that a lawn sets the tone for a property and sodding is the most efficient way to transform nearly any outdoor space.
Our Four Steps to Perfect Sod
Leveling and preparing your property for root establishment and drainage
02
Soil Conditioning for Root Integration
Amending the soil for long-lasting, healthy sod growth
03
Premium-Grade Sod
Premium-quality sod rolls, complete with seamless coverage and edges
04
Watering Schedule & Care Guidance
Providing a clear care plan for healthy rooting and sod life

Sod Installation FAQs
The best time to lay sod in Toronto is spring (late April to June) or early fall (September to early October) when temperatures are mild and moisture is consistent.
However, we welcome inquiries year round for consultations to see if sod installation or replacement is viable on your property at any given time.
Most residential sod installations can be completed within 1-2 days, pending yard size and layout.
If possible, remove any furniture or personal items from the areas where sodding will take place.
Our team can clear remaining debris, weeds or old grass as needed.
Sod installation costs can vary based on sod type, square footage and more.
Click here to request a quote from our team.
No, our team would remove any leftover grass first as laying sod over old grass or turf can lead to poor root development and other long-term challenges.
Once sodding is complete, consistent watering will be required (except in the case of artificial turf). Avoid mowing for 2-3 weeks and keep foot traffic over new sod to a minimum until fully rooted and established.
Your Ignite sod contractor will also provide a full watering schedule and care plan.
